Editing The Call-Sheet Layout
A schedule's call-sheet layout decides which sections appear and where they sit. It applies to the schedule's call sheets rather than changing the underlying day information.
Arrange A Layout
- Open Call Sheets and select Manage Call Sheets for the schedule.
- Select Edit Layout.
- Use Add Row to add space to Call Sheet Layout.
- Use the row's plus control to add columns.
- Drag a section from Call Sheet Options into a column.
- Drag sections within/between columns to organise them.
- Use a column's alignment icons to set left, centre or right alignment.
- Select Save Layout.
- Return to a day's Preview to inspect the result with actual data.
Removing a layout column returns its sections to the available options. Keep the layout readable for the number of cast and crew on your production.
Reuse A Layout
Select Download Layout to save the arrangement. To reuse a compatible saved file, select it in the import control and select Import Layout. Review the imported arrangement and a real call-sheet preview before distributing.
Troubleshooting
A section omitted from the layout can be absent from output even when its data exists. Adding a section does not populate missing data. A layout import must be a compatible CinePlatform layout file, not a PDF of a call sheet.